- Overview
This guide provides detailed instructions on how to manually place, copy, and modify counters in AEC Inspired for efficient project management.
2. Preparation
- Ensure Completion of Inspired Search: Verify that all initial searches and placements have been done.
- Step 1: Open Properties
- Click on any counter (e.g., A2) placed by Inspired Search.
- Right-click and select Properties to view and edit details on the right side of the screen.
- Step 2: Select and Edit Multiple Counters
- Right-click on a counter and select Select Similar.
- Choose to search either the current sheet or all sheets.
- Select Properties by name field to update across multiple sheets.
- Example: Change A2 to A3 for all selected counters.
- Step 3: Copy and Paste Counters
- Drag to select multiple counters or individual ones.
- Right-click and choose Copy.
- Navigate to the desired location, right-click, and select Paste.
- Ensure properties window is closed before copying.
- Step 4: Manual Counter Placement
- Go to the Assemblies tab and select Counters.
- Choose Default Counter and fill in the name field (e.g., A2).
- Place counters manually by clicking on the desired locations.
- Update the name field (e.g., change A2 to X2) to place different types of counters.
- Step 5: Bulk Edit Counters
- Open the Managed Data tab on the right side.
- Use filtering tools to isolate specific sheets or room types.
- Use the Bulk Edit button to apply changes across multiple items.
- Example: Change A2s to A3s on a specific sheet without selecting each individually.
- Step 6: Save and Verify Changes
- Save changes to ensure all modifications are applied.
- Verify that counters are correctly placed and labeled across the project.
- Review Patterns: Ensure counters are evenly spaced and accurately placed.
- Use Bulk Edit for Efficiency: Apply bulk changes using the Managed Data tab to save time.
- Double-Check Accuracy: Validate the correctness of manually placed counters.
- Proceed to Export: After making all necessary modifications, prepare for exporting the project.
- Training Continuation: The next session will cover detailed steps for exporting and managing counter data effectively.